BROCKTON AREA TRANSIT PARKING GARAGE

Brockton, MA

This new construction of a 91,000 square foot, precast concrete garage was designed by Fay, Spofford, and Thorndike to accommodate one future level.

Colantonio self-performed the site work including site preparation, foundations, utilities, drainage and grading. We also performed all flatwork activities including the slab on grade and cast-in-place toppings on the precast tees.  The project included construction of sidewalks and crosswalks connecting the garage to Brockton City Hall.  This work required traffic detouring and intense coordination with city officials and local businesses.

The tight, urban job site required the coordination of precast deliveries at night, mitigating potential hazards to pedestrians and other vehicles while keeping the project on schedule.