Project Description

Colantonio was the CM at Risk for this project located on a forested site.  This new, 88,709 square foot school features 29 general education classrooms for the kindergarten and first grade, along with 4 pre-kindergarten classrooms.  The building also includes a gymnasium, kitchen, cafetorium, art, health, music, and specialized classroom spaces.

The site work included extension of a public roadway, two vehicle drop-offs and parking lots, two playgrounds, a play field and connections to adjacent town-owned parcels.  The project, which includes a photo-voltaic array on the roof and HVAC systems that optimize energy performance, will seek LEED v4 for BD+C: Schools Certification.

The school was completed two months ahead of schedule.

Categories